CHESTER COUNTY, PA — Drivers on eastbound U.S. 30 should prepare for five days of daytime delays as pavement repairs and line painting close a lane between the U.S. 322 and Route 113 interchanges.
At a Glance
- Roads Affected: Eastbound U.S. 30 (Coatesville Downingtown Bypass) between U.S. 322 (Horseshoe Pike) and Route 113 (Uwchlan Avenue)
- Dates: Monday, September 21, through Friday, September 25
- Times: 9:00 AM to 3:00 PM daily
- Reason: Pavement repair and line painting
The right eastbound lane will close during the scheduled work hours. Drivers should plan extra time because backups and delays are expected through the construction zone. The schedule is weather dependent.
The work is part of a $6.8 million project providing long-term sinkhole remediation at two locations on U.S. 30 between Business U.S. 30 (Lancaster Avenue) and Clover Mill Road in West Whiteland and East Caln townships.
Crews are using pressurized grout to fill underground voids and stabilize the ground beneath the highway, reducing the risk of future sinkholes. The broader project also includes pavement reconstruction, drainage pipe replacement, and stabilization of roadside swales.
Road-Con of West Chester is the general contractor. The primary project is federally funded, while paving added to the contract is financed with state funds.
Avoid being caught in a daytime backup by checking the MyChesCo Traffic Center before traveling at https://www.mychesco.com/traffic/.
Support the local news that supports Chester County. MyChesCo delivers reliable, fact-based reporting and essential community resources—free for everyone. If you value that, click here to become a patron today.
