EAST MARLBOROUGH TWP, PA — East Marlborough Township supervisors will consider adopting a master plan for Unionville Village on December 9 that would guide future infrastructure investment, address traffic congestion and pedestrian safety concerns, and preserve the community’s historic character.
The Board of Supervisors will conduct a public hearing before considering whether to incorporate the Unionville Village Master Plan into the Unionville Area Regional Comprehensive Plan as an appendix.
The proposal, last revised October 13, establishes policy recommendations rather than legally binding requirements. Adoption would neither amend township zoning regulations nor authorize individual development or construction projects.
Transportation improvements are central to the initiative, particularly along Route 82 (Doe Run Road), where gaps in pedestrian infrastructure, limited parking and traffic congestion present challenges for residents, businesses and visitors.
Pennsylvania Department of Transportation crash data covering 2021 through 2025 identified concentrations of crashes near the Route 82 and Route 162 intersection, the eastern roundabout and the Unionville Recreation Association ballfields.
A township police speed study conducted April 23–29, 2026, near Cemetery Lane recorded 1,329 enforceable speeding violations among 39,502 vehicles. Drivers averaged 33 mph in the posted 30 mph zone.
The plan identifies 10 near-term initiatives intended for implementation within two years, including intersection studies at Route 82’s junctions with Routes 162 and 842, paving access points at the recreation association ballfields and installing sidewalks near the fire department and post office.
The township would also pursue grant funding for pedestrian improvements near Hood’s BBQ and a sidewalk connecting Unionville Elementary School to the eastern roundabout.
Longer-term recommendations include intersection improvements, enhanced pedestrian crossings, additional park parking, trail connections and the potential establishment of a village hall and community center.
Planning-level cost estimates place the proposed Route 82 pedestrian crossing and village gateway near the ballfields at $1 million or more. A crossing improvement near Farmer & Co. and Unionville Community Park is estimated at $250,000 to $1 million.
The recommendations also address stormwater management, historic preservation, parking availability and opportunities to use underutilized properties for community activities.
Unionville has approximately 652 residents across 294 households, according to 2020–2024 American Community Survey estimates. The existing 2024 regional comprehensive plan, covering East Marlborough, West Marlborough and Newlin townships, designates the village for mixed-use development emphasizing small businesses, appropriately scaled housing and historic preservation.
Development of the master plan began in early 2026 and incorporated an April pedestrian safety audit, an interactive public feedback map and two community planning workshops in May.
Bowman Consulting and Gateway Forward Planning & Consulting assisted with the initiative, which received partial funding through Chester County’s Vision Partnership Program.
The December 9 hearing begins at 7 p.m. at the township building, 721 Unionville Road, Kennett Square. Supervisors will receive public comments before considering adoption during their regular meeting.
Residents can review the proposed master plan at https://www.eastmarlborough.org/unionville-village-master-plan-public-comments-welcomed/.
Support the local news that supports Chester County. MyChesCo delivers reliable, fact-based reporting and essential community resources—free for everyone. If you value that, click here to become a patron today.
