COATESVILLE, PA — Drivers on the U.S. 30 (Coatesville-Downingtown Bypass) should prepare for overnight delays next week as PennDOT conducts geotechnical drilling along a key stretch of the highway.
At a Glance:
- Roads Affected: U.S. 30 (Coatesville-Downingtown Bypass)
- Dates: Monday, March 30, through Thursday, April 2
- Times: 8:00 PM – 6:00 AM
- Reason: Geotechnical drilling
PennDOT said lane closures will be in place in both directions between the Route 82 Interchange and the Old Mill Road overpass during overnight hours. Traffic will be reduced, and drivers should expect slower travel through the work zone.
No detour is planned, but motorists should anticipate backups and intermittent delays along the corridor. Plan extra time for overnight trips or seek alternate routes where possible.
Work will take place through the City of Coatesville and surrounding areas, including Valley, West Caln, and Sadsbury townships.
Drivers are urged to remain alert, reduce speeds, and follow all posted signs when traveling through the construction zone.
For real-time updates and additional traffic alerts across Chester County, visit the MyChesCo Traffic Center: https://www.mychesco.com/traffic/.
For the latest news on everything happening in Chester County and the surrounding area, be sure to follow MyChesCo on Google News and MSN.
